For today's post we go back in time to a project from the early 1980s when Cannistraro prefabricated and installed lengths of pipe up to 16" in diameter above the train tracks and through the tunnels around the Back Bay T Station. If you look closely, you can see Company President John Cannistraro, Jr. examining the galvanized steel storm drainage system from the tracks below.
No comments:
Post a Comment
Thank you for your interest in Cannistraro's Building with Intelligence 365 project. Tell us what you think by submitting a comment.