Wednesday, March 7, 2012

Day 28 - Hoisting Prefabricated Assemblies

The key to a lean approach is to eliminate waste within a process. Using prefabrication and just-in-time delivery minimizes the need for on-site stick welding and eliminates the piles of pipes that traditionally occupy space on the job site floor. This prefabricated assembly for 640 Memorial Drive's chilled water return system arrived from Cannistraro's fab shop, was hoisted into the building, and installed the same day.