Thursday, March 22, 2012

Day 39 - BIM at its Best

The project team for the MGH Lunder Building included some of the most BIM-savvy companies in the Boston area. BIM was utilized for everything from prefabrication of the hundreds of piping assemblies, to the scheduling of all equipment and deliveries to the job site. The screen shot of a 3D model shown above not only depicts the level of detail included in the model, but also the floor space that was included to help plan for a future chiller installation on the building's 5th floor mechanical room.